Power Generation · Controls And Instrumentation
Generator Controller And Instrumentation Replacement
An obsolete generator controller system replaced with a modern controller providing synchronisation, load sharing and a SCADA interface. The ageing process switch instrumentation was replaced at the same time with modern transmitters, so the plant reports live process values rather than only switch trips.
What We Did
- Electrical and control design
- Wiring of the controller panels and skids
- Generator controller configuration, including synchronisation and load sharing
- SCADA development for remote operation
- Full commissioning and handover
Got Something Like This On Your Plant?
Tell us what you are trying to solve. There is no charge for working out whether we are the right fit.